At 2:30 pm, the guys put the last container in the pod and Rachel locked the door. Now, it's all up to the insurance company and the contractors to put things right. She found out that the bathroom will have to be gutted because of the high moisture content under the linoleum and behind the marlite wall covering. She was happy about that because she's been wanting to update that bathroom anyway. In addition, the flood forced her to very rapidly downsize and throw away a lot of old teaching materials that were cluttering up the basement. After 8 years of retirement, it was time to let go. We also tossed all of Jon's college notebooks. He graduated 12 years ago! It's clear that a disaster can actually have some positive outcomes!
All packed up!
After I left there, we took a long walk through the college to check on the construction progress at Rockefeller Arts Center. It was a gorgeous, humid day so I couldn't wait to get into the pool. Steve was off to another meeting, so I just kept swimming. 240 lengths for a total of 1460. Just a little tired tonight.
No comments:
Post a Comment