Lift is a four letter word. Steve and Mr. Kennedy were at school by 6:00 am and of course the lift would not work. Despite an expensive repair job on Thursday, the leads were frayed. Fortunately, they were able to repair them, but it delayed the curtain repair process for hours.
The tech rehearsal was much better than the last two years. We were done at 3:00 and Steve sent all the kids home. They have gone above and beyond expectations this year and really earned some down time. Then the adult crew assembled to finish the last of the construction projects. Ben S. built a faucet; Tom installed a doorknob and made an oven door; , Rick made the refrigerator door; Sandy and Kevin built another small upright piano; Charlie and his daughter Jasmine finished painting the train engine; Steve installed swing rods on the units and I applied translucent film to the windows. Tomorrow, Steve and Scott are going to finish repairing the curtain carriage wheels. (If the lift works) I'll touch up the painted surfaces. Maybe that will be it!
I've deleted about 300 more photos up to 2007. I really don't think I have 50,000 photos. I may have downloaded that many, but a good portion have been deleted. Perhaps tomorrow I'll be able to post pictures again.
No comments:
Post a Comment